Our Projects
Skilled Team
Proven Experience
Complete Solutions
Quality & Compliance
Reliable Support
Checkout our recently completed work
RECONDITIONING OF TOILET FLOOR TILES AND FRAMES/ RENEWAL OF 460SQM LINOLEUM FLOORING
Reconditioning of toilet floor tiling
Reconditioning of the Door stainless steelframing.
Replacement of hand-wash drain pipes
Renewal of linoleum flooring.
FABRICATION OF THREE (3) UNITS NAVIGATIONAL BOUY
Hull construction, with steel plate by using traditional shipbuilding techniques… Plate bending, Webs, beams, and girders welded inside the hull and divided into several tanks.
The buoy has a central moonpool and a steel turntable.
TOILET SPACE MODIFICATION – 32 NOS
Renewal of over 1000 units of valves
Renewal of 32 units of shower mixer system and other accesories
Introduction of 32 units of WC toilet.
RENEWAL OF DECK WOOD ONBOARD OSV
Chipping and Power brushing of the deck upon removal of deck wood
Surface preparation IWO painting
REPAIR, RENEWAL AND MAINTENANCE OF PIPES AND VALVES
Renewal of over 130 pieces of valves
Repair and maintenance of hydraulic valves
Renewal of various pipes on deck
STRUTURAL REPAIR/HAUL REFURBISHMENT
Removal & Replacement of the side cladding
Renewal of the underwater side shell and bottom plate
Renewal of the transom plate and Engine base
Introduction of 4 sets of manholes on the floor plate
Non-destructive test on the hull
Blasting and painting of the hull/Structure
CHIPPING AND PAINTING OF 10,028 SQM DECK SUFACE
chipping and painting of main deck, super-structures, and accom decks
Pressure washing of the entire deck surface
power brushing of the suface IWO painting
Application of 2 coats of paint on the prepared surfaces.
RENEWAL OF DAMAGE BULWARK AND STIFFENERS
Renewal bow shell plating
Renewal of bulwark stiffener.
Reconditioning of chock.